Select Page

I stopped by the addition project in Mt. Pleasant this week to see how things are going, and they are certainly moving along! Since the last post about this job, our crew has finished the roof, most of the framing and was installing gorgeous windows when I was there. Next up:  insulation and drywall…. and then all the fun finishing work will begin.

Here’s the photo from this week along with a the final design created by Allison Holden at One Seed Design and Interiors.

Sam (green dot) looks out from a top level window opening before it is filled with one of those gorgeous black-framed windows.

 

Here is the beautiful design Allison developed with the homeowners.